Come check out his rare 2-bed 2.5-bath home that underwent a major renovation in 2019 -2020. All new systems at that time, including electrical, plumbing, roof, HVAC, water heater, windows, doors, and the list goes on. The kitchen offers all the upgrades one would expect from the shaker cabinets to the granite countertops and stainless steel appliances. In the primary suite, you will find a private bath complete with a spacious walk-in shower, complete with a rainwater faucet, a separate tub/shower combo as well, and a walk-in closet. The 2nd bedroom is spacious and has a private bath. The home is situated on almost a half-acre lot, complete with a large covered front porch, and the bonus of the current owners added a 6' vinyl privacy fence. This is a great house, ready for new owners!!!
| MLS # | 4391949 |
|---|---|
| Listing Type | For Sale |
| Style | House |
| Sub-Type | Resale |
| Status | Active Under Contract |
| Year | 1930 |
| Days On Site | 83 |
| Listing Provided By | Moss Realty | Greg Holland |
| Bed(s) | 2 |
|---|---|
| Bath(s) | 3 Total |
| SQ Feet | 1,202 |
| Story(s) | 1 |
| Acreage | 0.47 |
| Cooling | Ceiling Fan(s), Central Air |
|---|---|
| Heating | Heat Pump |
| Window Features | Insulated Window(s) |
| Appliances | Electric Oven, Electric Range, Microwave |
| Construction Materials | Vinyl |
|---|---|
| Foundation Details | Crawl Space |
| Garage Yes / No | No |
|---|---|
| Parking Features | Driveway |
| List Aor | Gaston Association of Realtors |
|---|
| Property | 161277 |
|---|
| State | NC |
|---|---|
| County | Cleveland |
| City | Kings Mountain |
| Zip Code | 28086 |
| Area | Cleveland |
| School District | Kings Mountain |
| Elementary School | North |
| High School | Kings Mountain |
| Listing VS Median (in 28086) | |
Price: $219,900 low | high Med: $319,450 sqft: 1,202 low | high Med: 1,714 $ / sqft: $183 low | high Med: $187 On site: 83 low | high Med: 135.5 | |
| State | NC |
|---|---|
| County | Cleveland |
| City | Kings Mountain |
| Zip Code | 28086 |
| Area | Cleveland |
| School District | Kings Mountain |
| Elementary School | North |
| High School | Kings Mountain |
| Listing VS Median (in 28086) | |
Price: $219,900 low | high Med: $319,450 sqft: 1,202 low | high Med: 1,714 $ / sqft: $183 low | high Med: $187 On site: 83 low | high Med: 135.5 | |