$280,000
 $1,461 est/mo Sourced by Back At You

6028 Gantts Trail,Wilmington, NC 28409

Wilmington, NC 28409

Share:

Description

Coastal Convenience Meets Comfortable Living Welcome home to this well-maintained 3-bedroom, 2-bath townhouse ideally located just 10 minutes from Carolina Beach. Offering an attractive price point for first-time homebuyers, small families, or those looking to enjoy the coastal lifestyle, this home combines comfort, value, and convenience. The desirable floor plan features a first-floor primary bedroom, providing easy everyday living. Recent updates include a newer roof installed in 2019 and a fresh professional paint job, giving the home a clean, move-in-ready feel. Enjoy outdoor living on the private fenced patio, with peaceful greenspace behind the property for added privacy and a relaxing view. Storage is abundant with a spacious walk-in attic and additional storage throughout the home. Residents also enjoy access to a community pool, while the property benefits from ample parking, making it easy to accommodate multiple vehicles and guests. Conveniently located near beaches, shopping, dining, and local attractions, this property presents an excellent opportunity to own an affordable home in a sought-after coastal area. Whether you're purchasing your first home, downsizing, or investing in a coastal retreat, this charming townhouse is ready to welcome you home.

Details

MLS #100584584
Listing TypeFor Sale
StyleTown House
HOA Dues$2,376
Sub-TypeResale
StatusActive
Year2003
Days On Site67
Listing Provided ByCarolina Retreats Vacations LLC | Nathan A Pelsh

Features

Bed(s)3
Bath(s) 2 Total
SQ Feet1,301
Garage2
Story(s)2
ZoningR-15
Acreage0.08
Property ViewNone

Interior

Interior FeaturesMaster Downstairs, Ceiling Fan(s), Pantry, Blinds/Shades
Heating Yes / NoYes
Cooling Yes / NoYes
CoolingCentral Air
Fireplace Yes / NoNo
Laundry FeaturesDryer Hookup, Washer Hookup
FurnishedUnfurnished
Rooms Total6

Exterior

Exterior FeaturesIrrigation System
RoofArchitectural Shingle
Foundation DetailsSlab
Waterfront FeaturesNone
ViewNone
Construction MaterialsBrick Veneer, Vinyl Siding, Wood Frame

Parking

Attached Garage Yes / NoYes
Garage Yes / NoYes
Parking FeaturesGarage Faces Front, Additional Parking, Gravel, Lighted, On Site, Paved, Garage

Utilities

UtilitiesCable Available, Sewer Available, Water Available, Fixed Wireless High Speed

Taxes

Tax Assessed Value278300
Tax Book Number5167
Tax Legal DescriptionLot 12 Sec 1 Winds Ridge
Tax Year2026

Area Information

StateNC
CountyNew Hanover
CityWilmington
Zip Code28409
Community NameWinds Ridge
School DistrictNew Hanover
Elementary SchoolAnderson
High SchoolAshley
Listing VS Median (in Winds Ridge)
Price:
$280,000
low | high
Med:
$280,000
50% of Average
sqft:
1,301
low | high
Med:
1,301
50% of Average
$ / sqft:
$215
low | high
Med:
$215
50% of Average
On site:
67
low | high
Med:
67
100% of Average
Sourced by Back At You

Market Activity 28409

Request a showing

Request a showing

Contact


Additional Information


Showing Information


Submit Form

Required Field
By submitting, you agree to receive promotional texts and/or calls from Coldwell Banker Sea Coast Advantage at the number provided. Message/data rates may apply. Consent is not a condition of purchase, and you can opt out anytime by replying STOP. Privacy Policy
Copyright 2026 NCRMLS. All rights reserved. North Carolina Regional Multiple Listing Service, (NCRMLS), provides content displayed here (“provided content”) on an “as is” basis and makes no representations or warranties regarding the provided content, including, but not limited to those of non-infringement, timeliness, accuracy, or completeness. Individuals and companies using information presented are responsible for verification and validation of information they utilize and present to their customers and clients. NCRMLS will not be liable for any damage or loss resulting from use of the provided content or the products available through Portals, IDX, VOW, and/or Syndication. Recipients of this information shall not resell, redistribute, reproduce, modify, or otherwise copy any portion thereof without the expressed written consent of NCRMLS.

Contact

Learn More About This Property

StateNC
CountyNew Hanover
CityWilmington
Zip Code28409
Community NameWinds Ridge
School DistrictNew Hanover
Elementary SchoolAnderson
High SchoolAshley
Listing VS Median (in Winds Ridge)
Price:
$280,000
low | high
Med:
$280,000
50% of Average
sqft:
1,301
low | high
Med:
1,301
50% of Average
$ / sqft:
$215
low | high
Med:
$215
50% of Average
On site:
67
low | high
Med:
67
100% of Average
Sourced by Back At You
Nearby Listings (Within 1/4 mile)
Price: $210K - $350K
sqft: 976 - 1,500
Nearby Listings Property ImageNearby Listings Details
314 Golden Road Property Photo 1
$300,000
314 Golden Road
Wilmington, NC 28409
6302 Peyton Court Property Photo 1
$350,000
6302 Peyton Court
Wilmington, NC 28409
Listing Updated: August 18, 2026 at 6:08:38 PM PDT